PR 00160: verschil tussen versies

Geen bewerkingssamenvatting
Geen bewerkingssamenvatting
 
(2 tussenliggende versies door 2 gebruikers niet weergegeven)
Regel 8: Regel 8:
|Start date=2017/01/01
|Start date=2017/01/01
|End date=2020/06/30
|End date=2020/06/30
|Summary=This work package is dedicated to the smooth running of the project. All partners contribute under the lead of HZ.It includes the steering group meetings that will take place every six months, the regular (at least 2x per year) 
|Summary=This work package is dedicated to the smooth running of the project. All partners contribute under the lead of HZ.It includes the steering group meetings that will take place every six months, the regular (at least 2x per year) submission of financial claims, the annual progress reports and a mid­term review. In addition all central programme requirements are included in this work package. The project aims to be cost-efficient with travel, steering group meetings will always be organized back-to-back with thematic partner meetings budgeted in WP3 to limit travel expenses. The same will apply to meetings with the programme, i.e. the training of the project partners will in principle coincide with the first partner meeting. This is also the reason why no separate costs for management have been included in the budget. In each of the four regions, the regional partners will also ensure the regional coordination with their associated knowledge partners (joint preparation of workshops here applicable, etc.) and define roles on regional level to ensure smooth cooperation. In addition to the regular face-to-face meetings, regular exchange and communication will take place through other means (phone, skype meetings, emails...). The project will ensure that a regular exchange will not only take place between partners but also with the programme (territorial facilitators and joint secretariat). It will closely monitor performance and delivery.
submission of financial claims, the annual progress reports and a mid­term review. In addition all central 
|Show summary=Nee
programme requirements are included in this work package. The project aims to be cost-efficient with travel, steering group meetings will always be organized back-to-back with thematic partner meetings budgeted in WP3 to limit travel expenses. 
The same will apply to meetings with the programme, i.e. the training of the project partners will in principle coincide with the first partner meeting. This is also the reason why no separate costs for management have been 
included in the budget. 
In each of the four regions, the regional partners will also ensure the regional coordination with their associated knowledge partners (joint preparation of workshops here applicable, etc.) and define roles on regional level to 
ensure smooth cooperation. In addition to the regular face-to-face meetings, regular exchange and communication will take place through other means (phone, skype meetings, emails...). 
The project will ensure that a regular exchange will not only take place between partners but also with the 
programme (territorial facilitators and joint secretariat). It will closely monitor performance and delivery.
|Show summary=Ja
|Show navigation tree=Nee
|Show navigation tree=Nee
|Show new page button=Nee
|Show sub projects=Nee
|Show sub projects=Nee
|Show participants=Nee
|Show participants=Nee
|Show sources=Nee
|Show sources=Nee
|Is homepage=Nee
|Show edit button=Ja
|Show VE button=Ja
|Show category label=Nee
|Show title=Ja
}}
}}

Huidige versie van 24 feb 2019 om 18:13