LC 00225: verschil tussen versies
Geen bewerkingssamenvatting |
Geen bewerkingssamenvatting |
||
Regel 8: | Regel 8: | ||
==Flood risks== | ==Flood risks== | ||
*Rainfall (minimal to no impact) / sea flooding | *Rainfall (minimal to no impact) / sea flooding | ||
*The risk of flooding is low for a return period of 1:4000 years ( | *The risk of flooding is low for a return period of 1:4000 years (interview with pilot manager, 2019). | ||
*Impacts: if a flood causes electricity failure in the Kloosterzande area (north of Hulst), the electricity assets in the town of Hulst will also be affected | *Impacts: if a flood causes electricity failure in the Kloosterzande area (north of Hulst), the electricity assets in the town of Hulst will also be affected even though this area does not get flooded (interview with pilot manager, 2019). | ||
{{Light Context | {{Light Context |
Versie van 13 jun 2019 09:37
Area description
The province of Zeeland lies in the southwest of the Netherlands with a total area of 293.000 hectares.
Number of inhabitants: 380.000 people (Pilotbook FRAMES, 2017).
Relevant characteristics of the water system (main water bodies): The Rhine-Meuse-Scheldt Delta and North Sea are the water bodies in this region.
Flood risks
- Rainfall (minimal to no impact) / sea flooding
- The risk of flooding is low for a return period of 1:4000 years (interview with pilot manager, 2019).
- Impacts: if a flood causes electricity failure in the Kloosterzande area (north of Hulst), the electricity assets in the town of Hulst will also be affected even though this area does not get flooded (interview with pilot manager, 2019).
Referenties
- FRAMES pilotbook 2019, FRAMES, FRAMES, 1 mei 2019.
- Water Resilient Electricity Network Zeeland Final report, Nelen en Schuurmans, Provincie Zeeland, 25 juli 2018.