Regel 7: Regel 7:
|Name=Denderleeuw
|Name=Denderleeuw
|Start date=2016/10/01
|Start date=2016/10/01
|End date=2020/01/31
|End date=2020/07/31
|Summary=Flood risks in Flanders are increasing, due to continuing land sealing and climate change. Addressing these risks will not be possible with protective measures only (e.g. embankments, flood retention zones, etc.) but will necessitate a wide set of measures. Some of these measures will require action to be taken by citizens. Considering the fact that Flemish flood risk management has limited experience with citizen engagement, it can be expected that the implementation of individual and community-based measures will not be self-evident and might even meet resistance.
|Summary=The main of this pilot is to increase the capacities of local organisations / institutions and communities, but the project will also unite relevant local stakeholders to address the flood vulnerability of the entire neighbourhood, including the physical resilience of potential future building developments.  The project intends to contribute to a better cooperation between local authorities.
Within FRAMES, the Province of East-Flanders and Ghent University will investigate the possibilities of individual and community-based flood risk action and how it can be encouraged. In the flood-prone areas of Ninove and Denderleeuw, participatory planning processes will unite inhabitants to explore the possibilities of this type of measures, their potential co-benefits and how citizens’ capacities can be strengthened to implement them.
|Show summary=Nee
|Show summary=Nee
|Show navigation tree=Nee
|Show navigation tree=Ja
|Show new page button=Nee
|Show new page button=Ja
|Show sub projects=Nee
|Show sub projects=Nee
|Show participants=Nee
|Show participants=Nee
Regel 21: Regel 20:
|Show category label=Nee
|Show category label=Nee
|Show title=Ja
|Show title=Ja
|FR_PLT_additional_Target=1 - 15.000 inhabitants
2 - 100 workers / 15 stakeholders
|FR_PLT_additional_Responsible person=Gebruiker:Btempels,Hannelore Mees
|FR_PLT_additional_Participant=Ghent University,Provincie Oost-Vlaanderen
}}
}}
{{Project FR PLT additional
{{Project FR PLT additional
|Country=Belgium
|Country=Belgium
|Coordinate=50.8831041, 4.0809779
|Coordinate=50.8831041, 4.0809779
|Objective=The main goals of the pilot cases in Ninove and Denderleeuw are the following:
|Pilot manager authority=* Province of East Flanders
1. Increasing inhabitants awareness of local flood risks and on individual and community-based measures that could be taken
* Ghent University
|Objective=The main goal of FRAMES Belgium is to have a strong participative process with three main target groups: 1) Flood-prone citizens; 2) Wider community, and 3) Local authorities.
|Flood risk=Fluvial.


2. Creating co-ownership of flood risk management (taking on co-responsibility)
The Dender has naturally a quick hydrological response because of the loam soils in the uphill zones. In case of intense rainfall, the river response is relatively quickly, increasing its level. Furthermore, the Dender Basin has been subject to land sealing through urbanization enhancing this process.
 
3. Increasing inhabitants knowledge, social networks and economic capacity to take flood risk measures
 
4. Stimulating overall spatial and social district development (exploring co-benefits with other issues at hand)
|Target=1 - 15.000 inhabitants
|Target=1 - 15.000 inhabitants
2 - 100 workers / 15 stakeholders
2 - 100 workers / 15 stakeholders

Huidige versie van 30 jun 2020 om 15:26



}

























Country: Belgium
Coordinate 50° 52' 59.17" N, 4° 4' 51.52" E
Pilot manager authority:
  • Province of East Flanders
  • Ghent University
Objective: The main goal of FRAMES Belgium is to have a strong participative process with three main target groups: 1) Flood-prone citizens; 2) Wider community, and 3) Local authorities.
Flood risk: Fluvial.

The Dender has naturally a quick hydrological response because of the loam soils in the uphill zones. In case of intense rainfall, the river response is relatively quickly, increasing its level. Furthermore, the Dender Basin has been subject to land sealing through urbanization enhancing this process.

Stakeholder(s):