FR PLT PR 00011: verschil tussen versies

Geen bewerkingssamenvatting
Geen bewerkingssamenvatting
 
Regel 8: Regel 8:
|Start date=2016/10/01
|Start date=2016/10/01
|End date=2020/07/31
|End date=2020/07/31
|Summary=While the first aim for this pilot is to increase the capacities of local organisations / institutions and communities, the project unites relevant local stakeholders to address the flood vulnerability of the entire neighbourhood, including the physical resilience of potential future building developments. The municipality of Denderleeuw will be involved intensively. The project intends to contribute to a better cooperation between local authorities.
|Summary=The main of  this pilot is to increase the capacities of local organisations / institutions and communities, but the project will also unite relevant local stakeholders to address the flood vulnerability of the entire neighbourhood, including the physical resilience of potential future building developments. The project intends to contribute to a better cooperation between local authorities.
|Show summary=Nee
|Show summary=Nee
|Show navigation tree=Ja
|Show navigation tree=Ja
Regel 30: Regel 30:
|Pilot manager authority=* Province of East Flanders
|Pilot manager authority=* Province of East Flanders
* Ghent University
* Ghent University
|Objective=The main goal of FRAMES Belgium was to have a strong participative process with three main target groups: 1) Flood-prone citizens; 2) Wider community, and 3) Local authorities.
|Objective=The main goal of FRAMES Belgium is to have a strong participative process with three main target groups: 1) Flood-prone citizens; 2) Wider community, and 3) Local authorities.
|Flood risk=Fluvial.
|Flood risk=Fluvial.



Huidige versie van 30 jun 2020 om 15:26



}

























Country: Belgium
Coordinate 50° 52' 59.17" N, 4° 4' 51.52" E
Pilot manager authority:
  • Province of East Flanders
  • Ghent University
Objective: The main goal of FRAMES Belgium is to have a strong participative process with three main target groups: 1) Flood-prone citizens; 2) Wider community, and 3) Local authorities.
Flood risk: Fluvial.

The Dender has naturally a quick hydrological response because of the loam soils in the uphill zones. In case of intense rainfall, the river response is relatively quickly, increasing its level. Furthermore, the Dender Basin has been subject to land sealing through urbanization enhancing this process.

Stakeholder(s):
Bezig met het laden van de kaart...



Onderwerpen