Regel 1: Regel 1:
By looking at the the activities, actors and methods/approaches used, this section will provide a better understanding of the the implementation process of the MLS approach. We will look describe the point of departure, describe who was involved (when, why and how) and what key decisive moments there were.
By looking at the the activities, actors and methods or approaches used, this section will provide a better understanding of the implementation process of the MLS approach. We will describe the point of departure, who was involved (when, why and how) and what key decisions were made when and why.
==== Point of departure of FRM strategies ====
=== Point of departure of FRM strategies ===
[[Bestand:Web Roskilde.png|gecentreerd|miniatuur|300x300px]]
[[Bestand:Roskilde web final.png|kaderloos|703x703px]]
Desired score to reach per layer in this pilot ({{Cite|resource=Bestand:FRAMES Monitoring Survey 9 Roskilde Completed.pdf|name=Baseline survey, 2017|dialog=process-file-dialog}}).
 
''Figure 1: Current and desired score to reach per layer in this pilot ({{Cite|resource=Bestand:FRAMES Monitoring Survey 9 Roskilde Completed.pdf|name=Baseline survey, 2019|dialog=process-file-dialog}}).''
 
To measure the impact of FRAMES on improving the flood resilience of pilot areas, communities and authorities both a baseline and final monitoring survey have been conducted. The surveys were completed by pilot managers in consultation with key pilot stakeholders. The baseline survey included questions about the actual situation in 2017 (before the project started) and expectations for 2020 (see figure 1). The final survey contained similar questions, but about the actual situation in 2020 and expected situation for 2025, five years after the pilot projects are finished. All the scores for both surveys along with an interpretation, can be found in chapter 8 of the {{Cite|resource=Bestand:Transnational Monitor and Evaluation report FRAMES (HZ June 2020).pdf|name=Transnational Monitoring and Evaluation Report|dialog=process-file-dialog}}.


=== Stakeholders involved ===
=== Stakeholders involved ===
* {{External link|resource=Resource Hyperlink 00609|name=Roskilde Municipality|dialog=process-linkwebsite-dialog}}
* {{External link|resource=Resource Hyperlink 00609|name=Roskilde Municipality|dialog=process-linkwebsite-dialog}}
* The {{Cite|resource=Resource Hyperlink 00610|name=Danish Emergency Management Agency|dialog=process-linkwebsite-dialog}} (DEMA)
* {{External link|resource=Resource Hyperlink 00762|name=Radius|dialog=process-linkwebsite-dialog}} (electricity grid company)
* The {{External link|resource=Resource Hyperlink 00611|name=police|dialog=process-linkwebsite-dialog}}
* The utilities company  
* Landowner Association
* The {{External link|resource=Resource Hyperlink 00612|name=Danish Storm Council|dialog=process-linkwebsite-dialog}}
* The {{External link|resource=Resource Hyperlink 00612|name=Danish Storm Council|dialog=process-linkwebsite-dialog}}
* The {{External link|resource=Resource Hyperlink 00613|name=Danish Red Cross|dialog=process-linkwebsite-dialog}}
* The {{External link|resource=Resource Hyperlink 00613|name=Danish Red Cross|dialog=process-linkwebsite-dialog}}
* {{Cite|resource=Resource Hyperlink 00614|name=Insurance & Pension Denmark|dialog=process-linkwebsite-dialog}} (IDP)
* 3 insurance companies
* Volunteers (local people)
* Volunteers (local people)
* {{External link|resource=Resource Hyperlink 00615|name=Danish Coastal Authority|dialog=process-linkwebsite-dialog}} (DCA)  
* {{External link|resource=Resource Hyperlink 00615|name=Danish Coastal Authority|dialog=process-linkwebsite-dialog}} (DCA)  
* {{External link|resource=Resource Hyperlink 00616|name=University College Copenhagen|dialog=process-linkwebsite-dialog}}
* {{External link|resource=Resource Hyperlink 00616|name=University College Copenhagen|dialog=process-linkwebsite-dialog}}
* East Zealand's Emergency Agency
* {{External link|resource=Resource Hyperlink 00763|name=Roskilde Fire Department|dialog=process-linkwebsite-dialog}}
* Home owners' association in Jyllinge Nordmark
* Households in the area
* Households in the area
=== Role of key actors ===
=== Role of key actors ===
Before the pilot started, the expectations of the {{External link|resource=Resource Hyperlink 00615|name=Danish Coastal Authority|dialog=process-linkwebsite-dialog}} (DCA) for cooperation were low because they thought that stakeholders would not be interested to have discussions with them or answer the questionnaires. The reason behind is the complicated political situation in Jtyllinge Nordmark regarding the establishment of a dike in a Natura 2000 area. Additionally, the citizens were already bothered a lot by researchers and journalists after the flooding in 2013.  However, currently the local communities are very engaged. This may be influenced by the fact that people living in this area are rich and well educated. Moreover, the perception of flooding is also different on the west coast of Jutland. On the west coast people experience flooding more often, they learnt to live with the water. But the response rate was high and some people even approached the DCA to be interviewed.
The citizens were already bothered a lot by researchers and journalists after the flooding in 2013 and the expectations for the stakeholders to participate were low.  However, currently the local communities are very engaged. This may be influenced by the fact that people still suffer from the flooding. Moreover, the perception of flooding is also different on the west coast of Jutland. On the west coast people experience flooding more often, they learnt to live with the water. But the response rate was high and some people even approached the DCA to be interviewed.


The main purpose of the {{External link|resource=Resource Hyperlink 00615|name=Danish Coastal Authority|dialog=process-linkwebsite-dialog}}  is to serve the Ministry of Environment and Food and make sure that the Danish population is aware of the flood risk, and to maintain some dikes on west coast as well. During FRAMES, the  responsibility of the DCA is to advise authorities on risk reduction. There are several governmental units who know about FRM from the sea, regional advisors for municipalities, local emergency management, sewage companies. Not too much was done on response and recovery. However, the DCA decided to give more importance to this topic as well because of climate change: response and recovery should be part of risk reduction. In the risk reduction phase you should start planning for response and recovery already. Until now risk reduction was mainly taking prevention measures, layer 1.  The DCA avoids to work directly with civilians to avoid political problems with municipalities.
The main purpose of the {{External link|resource=Resource Hyperlink 00615|name=Danish Coastal Authority|dialog=process-linkwebsite-dialog}}  is to serve the Ministry of Environment and Food and make sure that the Danish population is aware of the flood risk, and to maintain some dikes on west coast as well. During FRAMES, the  responsibility of the DCA is to advise authorities on risk reduction. There are several governmental units who know about FRM from the sea, regional advisors for municipalities, local emergency management, sewage companies. Not too much was done on response and recovery. However, the DCA decided to give more importance to this topic as well because of climate change: response and recovery should be part of risk reduction. In the risk reduction phase you should start planning for response and recovery already. Until now risk reduction was mainly taking prevention measures, layer 1.   


Other important actors in this pilot are:
Other important actors in this pilot are:
Regel 32: Regel 31:
• The {{Cite|resource=Resource Hyperlink 00614|name=Insurance & Pension Denmark|dialog=process-linkwebsite-dialog}} (IPD) is the Danish trade association for insurance companies and pension funds. The insurance companies  process the claims of the damages and pay back the local communities to rebuild the houses.
• The {{Cite|resource=Resource Hyperlink 00614|name=Insurance & Pension Denmark|dialog=process-linkwebsite-dialog}} (IPD) is the Danish trade association for insurance companies and pension funds. The insurance companies  process the claims of the damages and pay back the local communities to rebuild the houses.


• The {{Cite|resource=Resource Hyperlink 00610|name=Danish Emergency Management Agency|dialog=process-linkwebsite-dialog}} has a specific role, very focused on response, once the water starts to retreat, they will leave the area. Once they know no human life is at stake or no vital infrastructure is in danger they will back up and drive home again even though there are people with water in their houses. They are making at the moment some guideline made on how to manage the volunteers groups to make sure that they come for the right reason and if they are aware of the liability.
• The Roskilde Fire Department has a specific role, very focused on response, once the water starts to retreat, they will leave the area. They are making at the moment some guideline made on how to manage the volunteers groups to make sure that they come for the right reason and if they are aware of the liability.


• The {{External link|resource=Resource Hyperlink 00613|name=Danish Red Cross|dialog=process-linkwebsite-dialog}} is involved in international projects but they also helped in the recovery after the flood in 2013. They can create local groups to help in the emergency planning. The Red Cross did a whole study on the psychological aspects of the flood. For instance, there was a warning this year and they did a survey to the local doctors. It seems that there is an increased in the number people of people visiting the doctor to ask for medication that can relax (sleeping piles) because they are nervous.
• The {{External link|resource=Resource Hyperlink 00613|name=Danish Red Cross|dialog=process-linkwebsite-dialog}} is involved in international projects but they also helped in the recovery after the flood in 2013. They can create local groups to help in the emergency planning. The Red Cross did a whole study on the psychological aspects of the flood. For instance, there was a warning this year and they did a survey to the local doctors. It seems that there is an increased in the number people of people visiting the doctor to ask for medication that can relax (sleeping piles) because they are nervous.


• The police has the role to evacuate people during emergencies.
Radius (electricity grid company)
 
=== Main activities ===
''Step 1: draft + sent out questionnaire''
 
Questionnaires were sent out by email in Feb 2019 to households including flooded houses (200-300) and not flooded. The questionnaire was sent out to 500 households. Replies were received from 155 respondents, which gives a general response rate of 31%. Of these, 64 had experienced their houses being flooded. A total of 268 houses were flooded in Jyllinge Nordmark after Storm Bodil


The National Emergency Management group, the police and the fire fighters form the ''crisis management group''. They have the technical equipment needed.  There is also a solidarity group of volunteers of retired fire fighters, police, and scouts.
Some of the people who were not flooded called to ask if it was needed for them to answer the questionnaire. The purpose was to find out their experiences after the flooding, why the process was so slow, what went well and what didn’t go well and find out the barriers. Some questions were like this: did you know before the flood who could you contact, did you know what to do, did you know what you were allowed to do legally, where did you see improvements, which stakeholders would you like to see involve more, what information did you need, how would you prefer to get the information, who did you receive info from, where people live, how did you handle that, who handled it, what can be expected, if they were interested to be part of a local group of volunteers to help in recovery, if they received help from the Red Cross and if they would contact them again. The questionnaire also included questions about rehousing: who was in charge of doing it, what went well, what didn’t go well, how long were you rehoused and what could have been done to  shorten this time. There was not information about these issues, the barriers of having to live in a non-permanent house because some of them were living in construction containers.


The sewage companies do not have too much to say in the recovery process, they have a role in prevention.
The aim was to find out what kind of stakeholders citizens expect more from and also from which ones they received help. They were also asked who do you think is responsible of the recovery process. The answer was very interesting because they all believed is the Storm Surge Council responsible of it.


=== Main activities ===
This part of the study consisted of questionnaires sent out to residents in Jyllinge Nordmark, who lived in the area that had been hit by flooding. The questionnaires were sent by ordinary post by the Danish Coastal Authority with an enclosed franked return envelope on 8 February 2019 and the last reply was received on 25 March 2019. The questionnaire was sent out to 500 households. Replies were received from 155 respondents, which gives a general response rate of 31%. Of these, 64 had experienced their houses being flooded. A total of 268 houses were flooded in Jyllinge Nordmark after Storm Bodil. This gives a response rate of 24% from this group,
''Step 1: draft + sent out questionnaire''
 
The duration of the rehousing was very different among the 52 respondents who said that they were rehoused. The majority of the residents were rehoused for 7-9 months, but there was also one single instance where the rehousing lasted under a month, while 15 spent more than one year in a rehousing situation


Questionnaires were sent out by email in Feb 2019 to 450-550 households including flooded houses (200-300) and not flooded.
The general picture generated from these comments is that there is a big difference between how the homeowners were treated by their insurance company, and what they were subsequently awarded in compensation. The responses give the direct impression that the insurance companies did not provide their policyholders with a uniform and transparent process.


The people who were not flooded called to ask if it was needed for them to answer the questionnaire. The purpose was to find out their experiences after the flooding, why the process was so slow, what went well and what didn’t go well and find out the barriers. Some questions were like this: did you know before the flood who could you contact, did you know what to do, did you know what you were allowed to do legally, where did you see improvements, which stakeholders would you like to see involve more, what information did you need, how would you prefer to get the information, who did you receive info from, where people live, how did you handle that, who handled it, what can be expected, if they were interested to be part of a local group of volunteers to help in recovery, if they received help from the Red Cross and if they would contact them again. The questionnaire also included questions about rehousing: who was in charge of doing it, what went well, what didn’t go well, how long were you rehoused and what could have been done to  shorten this time. There was not information about these issues, the barriers of having to live in a non-permanent house because some of them were living in construction containers.
Many mentioned in their responses that the process was far too slow and drawn-out, and that there were too many agencies involved, which resulted in poor or lacking communication between the parties. Some of them were also dissatisfied with the municipality and did not feel that they were visible enough.


DCA also asked more or less the same questions about the municipalities and insurance companies: did you receive any help, what kind of help, what kind of help do you prefer to receive in the future and how did you experienced the whole process. The aim was to find out what kind of stakeholders citizens expect more from and also from which ones they received help. They were also asked who do you think is responsible of the recovery process. The answer was very interesting because they all believed is the Storm Surge Council responsible of it.
Overall, the responses to the questionnaire, both open and closed, together with the two group interviews with residents, give a picture wherein the great majority whose homes were flooded experienced the subsequent rebuilding process as being difficult and frustrating. They experienced a lack of clarity in the delegation of responsibility and in communication generally, uncertainty about their insurance coverage and


This questionnaire will unveil how and why the recovery process was obstructed. The focus will also be on the psychological aspects of floods. DCA got reply/feedback from 150 household out of 550 (27%). The answers were received recently (few days before the interview) and they show very clear that insurance companies are getting the biting and municipalities not giving enough information. Based on the answers, 65% were flooded in 2013, 83% were rehoused, some of them were rehoused up to 2-3 years. Interviewees also replied that the only good thing for the recovery / the rehousing was the bond of local community. They were asked overall how did they experience the rehousing period and most of them said ‘bad or very bad’, only 3% thought that it was good. 92% said of people said that they were not aware of what to do to recover. No negative replies were received but the reader could feel the emotions of people through in the answers. University College Copenhagen will further analyze the outcomes of the questionnaires in November/December 2019.
were unsure as to what was expected of them.


''Step 2: Stakeholder analysis''
''Step 2: Stakeholder analysis''


Based on the answers provided via the questionnaires, the DCA and University College Copenhagen will do a stakeholder analysis.
Based on the answers provided via the questionnaires, the DCA and University College Copenhagen did a stakeholder analysis.


''Step 3. Interview the main stakeholders to get their side of it.''
''Step 3. Interview the main stakeholders to get their side of it.''


The University College Copenhagen will conduct 8-10 qualitative interviews with the main stakeholders in November/ December 2019: The Danish Red Cross, the Landowners Association, Storm Surge Council. Further, they will conduct two focus group interviews with citizens in the area.
The University College Copenhagen carried out 10 interviews with professional stakeholders. Most of the interviews were with one person. Two were with several interviewees. A total of 13 people was interviewed. The questions were like:  
 
(1) How was the rebuilding experienced?
 
(2) Which conditions were relevant to the rebuilding?
 
(3) Which learning points have led to new practice?
 
(4) Which problems have yet to be solved?
 
The following interviews were carried out:
* Roskilde Municipality (Technical and Environmental Department)
* Roskilde Fire Brigade (incident
 
 
commander during the flooding)
* Roskilde Fire Brigade (on duty during the flooding)
* Danish Storm Council (secretariat staff)
* Danish Storm Council (head of claims management)
* Insurance company 1
* Insurance company 2
* Insurance company 3
* Red Cross
* Radius (electricity grid company)
In addition, two focus group interviews with citizens in the area were conducted.


''Step 4: Draft guidelines for future events''
''Step 4: Draft guidelines for future events''


Develop a step by step guide using the questionnaire, the qualitative interviews and the focus group interviews. The guide is to make clear what do to in a flood recovery situation because it’s not clear in Denmark: who to contact, who is responsible, what authorities could do to improve their capacity, or what other new organizations could be helpful. For instance, the Danish Red Cross went to help in the area after the flood. However, they are not used to do this type of work in Denmark because they work a lot internationally. Thus, they tried to take methods from 3rd world countries and use them in the Danish setting instead. They would create groups of local emergency management units. The civilians living in the area would help out in case of flooding, talking to people, make them aware of the situation. There is also interest to find out more on the psychological part of it. There are cases in the area of ‘flood children’, children that whenever it rains in the area they are afraid that they would be flooded again. The Red Cross did a whole project on the psychological aspects of the flood.
Develop a step by step guide using the questionnaire, the qualitative interviews and the focus group interviews. The guide is to make clear what do to in a flood recovery situation. These recommendations are directed at those responsible for coordinating or planning a rebuilding process in a residential area hit by coastal flooding.
 
The recommendations are directed primarily at those of you who work for an authority or organisation with responsibility for emergency preparedness or coordination in connection with flooding. It will also be useful knowledge however for others, e.g. members of voluntary organisations or resident groups, who wish to contribute towards a good rebuilding process should flooding occur.
 
When coastal flooding hits a residential area, it affects many people. Houses, gardens and roads are flooded and can be destroyed. When the water recedes and the damage becomes clearer, the residents are left in a situation where they have lost their home and their valuables. Their lives are completely changed – at least for a time. Their home has suddenly become uninhabitable, and they are affected mentally.
 
Ahead lies the process of rebuilding the hardest hit areas and returning the daily lives of the residents affected to how it was before the flooding. Here, a number of authorities and organisations play central roles: some tasks are clearly defined by law, while others are not – similarly, the delegation of responsibility is often unclear. Regardless, there is an expectation from residents that someone will take responsibility for the tasks which need to be done. These recommendations focus on those tasks that are not clearly anchored.
 
It is necessary in these cases for the relevant parties in the individual municipality or local neighbourhood to work together to delegate responsibility and assign roles – ideally before the need actually arises. The purpose of these recommendations is to contribute to this process.


The Red Cross had the issue that they received volunteers coming from other areas to help after the flood in 2013 but they did not have anyone to coordinate them, they did not know what to do with them. DCA is trying to collaborate with the British partners on developing such guide because they have a nice guide already. It’s very clear in UK what to do, who to contact, when to take photos, when to start cleaning up the floor. In Denmark they had no idea, they waited for several days without doing anything because they were not sure what they were allowed to do. That depends probably on the rules of different insurance companies: one would allow to start cleaning up the house yourself, others can take longer to come out and have a look at the house. The population was quite confused on what actually they were allowed to do, and who will make sure that they will have a  place to live in. The situation was very unclear whose responsibility is: local communities, municipalities, or insurance companies.
The study’s '''conclusions''' offer many recommendations for professional planning work. Here, we have highlighted the nine most important. We have not listed those already defined by law. We have instead selected those ones that are characterised by lacking a clear anchoring and which therefore need to be brought into focus.
* Make plans for the rebuilding
* Create clear assignment of roles
* Communicate with residents
* Be physically present
* The good rebuilding process
* Practical assistance
* Offer building advice
* Offer psycho-social support
* Create a network
* Evaluate and implement new teaching
{{Light Context
{{Light Context
|Supercontext=FR PLT PR 00007
|Supercontext=FR PLT PR 00007

Huidige versie van 3 jul 2020 om 11:40

By looking at the the activities, actors and methods or approaches used, this section will provide a better understanding of the implementation process of the MLS approach. We will describe the point of departure, who was involved (when, why and how) and what key decisions were made when and why.

Point of departure of FRM strategies

Roskilde web final.png

Figure 1: Current and desired score to reach per layer in this pilot (Baseline survey, 2019).

To measure the impact of FRAMES on improving the flood resilience of pilot areas, communities and authorities both a baseline and final monitoring survey have been conducted. The surveys were completed by pilot managers in consultation with key pilot stakeholders. The baseline survey included questions about the actual situation in 2017 (before the project started) and expectations for 2020 (see figure 1). The final survey contained similar questions, but about the actual situation in 2020 and expected situation for 2025, five years after the pilot projects are finished. All the scores for both surveys along with an interpretation, can be found in chapter 8 of the Transnational Monitoring and Evaluation Report.

Stakeholders involved

Role of key actors

The citizens were already bothered a lot by researchers and journalists after the flooding in 2013 and the expectations for the stakeholders to participate were low.  However, currently the local communities are very engaged. This may be influenced by the fact that people still suffer from the flooding. Moreover, the perception of flooding is also different on the west coast of Jutland. On the west coast people experience flooding more often, they learnt to live with the water. But the response rate was high and some people even approached the DCA to be interviewed.

The main purpose of the Danish Coastal Authority is to serve the Ministry of Environment and Food and make sure that the Danish population is aware of the flood risk, and to maintain some dikes on west coast as well. During FRAMES, the responsibility of the DCA is to advise authorities on risk reduction. There are several governmental units who know about FRM from the sea, regional advisors for municipalities, local emergency management, sewage companies. Not too much was done on response and recovery. However, the DCA decided to give more importance to this topic as well because of climate change: response and recovery should be part of risk reduction. In the risk reduction phase you should start planning for response and recovery already. Until now risk reduction was mainly taking prevention measures, layer 1. 

Other important actors in this pilot are:

• The Danish Storm Councill is an independent Council who handles cases concerning three types of natural catastrophes: storm surge, flooding from waterways and lakes and windfall. The Storm Surge Council in Denmark determines whether or not it is a flood surge or if it is just a storm. A flood surge should have a return period of 20 years event to make sure that communities get compensated by the insurance companies.

• Municipality needs to know what is its responsibility in the recovery process. Municipality informs communities about what do to in case of flooding and recovery.

• The Insurance & Pension Denmark (IPD) is the Danish trade association for insurance companies and pension funds. The insurance companies  process the claims of the damages and pay back the local communities to rebuild the houses.

• The Roskilde Fire Department has a specific role, very focused on response, once the water starts to retreat, they will leave the area. They are making at the moment some guideline made on how to manage the volunteers groups to make sure that they come for the right reason and if they are aware of the liability.

• The Danish Red Cross is involved in international projects but they also helped in the recovery after the flood in 2013. They can create local groups to help in the emergency planning. The Red Cross did a whole study on the psychological aspects of the flood. For instance, there was a warning this year and they did a survey to the local doctors. It seems that there is an increased in the number people of people visiting the doctor to ask for medication that can relax (sleeping piles) because they are nervous.

• Radius (electricity grid company)

Main activities

Step 1: draft + sent out questionnaire

Questionnaires were sent out by email in Feb 2019 to households including flooded houses (200-300) and not flooded. The questionnaire was sent out to 500 households. Replies were received from 155 respondents, which gives a general response rate of 31%. Of these, 64 had experienced their houses being flooded. A total of 268 houses were flooded in Jyllinge Nordmark after Storm Bodil

Some of the people who were not flooded called to ask if it was needed for them to answer the questionnaire. The purpose was to find out their experiences after the flooding, why the process was so slow, what went well and what didn’t go well and find out the barriers. Some questions were like this: did you know before the flood who could you contact, did you know what to do, did you know what you were allowed to do legally, where did you see improvements, which stakeholders would you like to see involve more, what information did you need, how would you prefer to get the information, who did you receive info from, where people live, how did you handle that, who handled it, what can be expected, if they were interested to be part of a local group of volunteers to help in recovery, if they received help from the Red Cross and if they would contact them again. The questionnaire also included questions about rehousing: who was in charge of doing it, what went well, what didn’t go well, how long were you rehoused and what could have been done to  shorten this time. There was not information about these issues, the barriers of having to live in a non-permanent house because some of them were living in construction containers.

The aim was to find out what kind of stakeholders citizens expect more from and also from which ones they received help. They were also asked who do you think is responsible of the recovery process. The answer was very interesting because they all believed is the Storm Surge Council responsible of it.

This part of the study consisted of questionnaires sent out to residents in Jyllinge Nordmark, who lived in the area that had been hit by flooding. The questionnaires were sent by ordinary post by the Danish Coastal Authority with an enclosed franked return envelope on 8 February 2019 and the last reply was received on 25 March 2019. The questionnaire was sent out to 500 households. Replies were received from 155 respondents, which gives a general response rate of 31%. Of these, 64 had experienced their houses being flooded. A total of 268 houses were flooded in Jyllinge Nordmark after Storm Bodil. This gives a response rate of 24% from this group,

The duration of the rehousing was very different among the 52 respondents who said that they were rehoused. The majority of the residents were rehoused for 7-9 months, but there was also one single instance where the rehousing lasted under a month, while 15 spent more than one year in a rehousing situation

The general picture generated from these comments is that there is a big difference between how the homeowners were treated by their insurance company, and what they were subsequently awarded in compensation. The responses give the direct impression that the insurance companies did not provide their policyholders with a uniform and transparent process.

Many mentioned in their responses that the process was far too slow and drawn-out, and that there were too many agencies involved, which resulted in poor or lacking communication between the parties. Some of them were also dissatisfied with the municipality and did not feel that they were visible enough.

Overall, the responses to the questionnaire, both open and closed, together with the two group interviews with residents, give a picture wherein the great majority whose homes were flooded experienced the subsequent rebuilding process as being difficult and frustrating. They experienced a lack of clarity in the delegation of responsibility and in communication generally, uncertainty about their insurance coverage and

were unsure as to what was expected of them.

Step 2: Stakeholder analysis

Based on the answers provided via the questionnaires, the DCA and University College Copenhagen did a stakeholder analysis.

Step 3. Interview the main stakeholders to get their side of it.

The University College Copenhagen carried out 10 interviews with professional stakeholders. Most of the interviews were with one person. Two were with several interviewees. A total of 13 people was interviewed. The questions were like:

(1) How was the rebuilding experienced?

(2) Which conditions were relevant to the rebuilding?

(3) Which learning points have led to new practice?

(4) Which problems have yet to be solved?

The following interviews were carried out:

  • Roskilde Municipality (Technical and Environmental Department)
  • Roskilde Fire Brigade (incident


commander during the flooding)

  • Roskilde Fire Brigade (on duty during the flooding)
  • Danish Storm Council (secretariat staff)
  • Danish Storm Council (head of claims management)
  • Insurance company 1
  • Insurance company 2
  • Insurance company 3
  • Red Cross
  • Radius (electricity grid company)

In addition, two focus group interviews with citizens in the area were conducted.

Step 4: Draft guidelines for future events

Develop a step by step guide using the questionnaire, the qualitative interviews and the focus group interviews. The guide is to make clear what do to in a flood recovery situation. These recommendations are directed at those responsible for coordinating or planning a rebuilding process in a residential area hit by coastal flooding.

The recommendations are directed primarily at those of you who work for an authority or organisation with responsibility for emergency preparedness or coordination in connection with flooding. It will also be useful knowledge however for others, e.g. members of voluntary organisations or resident groups, who wish to contribute towards a good rebuilding process should flooding occur.

When coastal flooding hits a residential area, it affects many people. Houses, gardens and roads are flooded and can be destroyed. When the water recedes and the damage becomes clearer, the residents are left in a situation where they have lost their home and their valuables. Their lives are completely changed – at least for a time. Their home has suddenly become uninhabitable, and they are affected mentally.

Ahead lies the process of rebuilding the hardest hit areas and returning the daily lives of the residents affected to how it was before the flooding. Here, a number of authorities and organisations play central roles: some tasks are clearly defined by law, while others are not – similarly, the delegation of responsibility is often unclear. Regardless, there is an expectation from residents that someone will take responsibility for the tasks which need to be done. These recommendations focus on those tasks that are not clearly anchored.

It is necessary in these cases for the relevant parties in the individual municipality or local neighbourhood to work together to delegate responsibility and assign roles – ideally before the need actually arises. The purpose of these recommendations is to contribute to this process.

The study’s conclusions offer many recommendations for professional planning work. Here, we have highlighted the nine most important. We have not listed those already defined by law. We have instead selected those ones that are characterised by lacking a clear anchoring and which therefore need to be brought into focus.

  • Make plans for the rebuilding
  • Create clear assignment of roles
  • Communicate with residents
  • Be physically present
  • The good rebuilding process
  • Practical assistance
  • Offer building advice
  • Offer psycho-social support
  • Create a network
  • Evaluate and implement new teaching























Referenties