Geen bewerkingssamenvatting
Geen bewerkingssamenvatting
Regel 4: Regel 4:
In the meantime, students of the architecture program have started designing the building. On our news page you will find a nice interview with lecturer-researcher Maarten den Hollander and students who are working on this pilot within FACET: {{Cite|resource=Resource Hyperlink 01053|name=click here for the article|dialog=process-linkwebsite-dialog}}.  
In the meantime, students of the architecture program have started designing the building. On our news page you will find a nice interview with lecturer-researcher Maarten den Hollander and students who are working on this pilot within FACET: {{Cite|resource=Resource Hyperlink 01053|name=click here for the article|dialog=process-linkwebsite-dialog}}.  


=== Construction of FACET pilot HZ University of Applied Sciences started. ===
==== Construction of FACET pilot HZ University of Applied Sciences started ====
On Monday September 12, the construction of a bio-circular accommodation started in Middelburg (Zeeland, the Netherlands).
On Monday September 12, the construction of a bio-circular accommodation started in Middelburg (Zeeland, the Netherlands).


Regel 11: Regel 11:
Would you like to come and take a look? Then come to [https://zlnd2050.nl/ festival ZLND2050] on Saturday 24 September to view the progress of the construction of this unique accommodation.  
Would you like to come and take a look? Then come to [https://zlnd2050.nl/ festival ZLND2050] on Saturday 24 September to view the progress of the construction of this unique accommodation.  


=== Pictures ===
==== Many thanks to ====
The following parties contributed to the realization of this pilot:
 
{{External link|resource=Resource Hyperlink 01179|name=Rothuizen Architecten en Adviseurs B.V|dialog=process-linkwebsite-dialog}}
 
{{External link|resource=Resource Hyperlink 01180|name=Thys + Gutberlet architectuur|dialog=process-linkwebsite-dialog}}
 
{{External link|resource=Resource Hyperlink 01181|name=VKP Bouw|dialog=process-linkwebsite-dialog}}
 
{{External link|resource=Resource Hyperlink 01182|name=Van de Velde installatiegroep|dialog=process-linkwebsite-dialog}}
 
{{External link|resource=Resource Hyperlink 01183|name=Van Aken schroeffundering|dialog=process-linkwebsite-dialog}}
 
==== Pictures ====
Construction started at the location on Kleverkerseweg in Middelburg
Construction started at the location on Kleverkerseweg in Middelburg
[[Bestand:Bio based accommodation construction.jpg|geen|omkaderd|Frame 19-9-2022]]
[[Bestand:Bio based accommodation construction.jpg|geen|omkaderd|Frame 19-9-2022]]

Versie van 19 sep 2022 15:52

Pilot description

We will work with tourist entrepreneurs and other stakeholders (f.e. architects, contractors) to Co-create the Circular design proposal. In this way we demonstrate the possibility of a circular economy tourist accommodation and will also function as a test for tourist entrepreneurs who want to invest in circular economy accommodation but still have concerns; by involving them in the design they can test features and technics that they plan to apply, and receive feedback from users.

In the meantime, students of the architecture program have started designing the building. On our news page you will find a nice interview with lecturer-researcher Maarten den Hollander and students who are working on this pilot within FACET: click here for the article.

Construction of FACET pilot HZ University of Applied Sciences started

On Monday September 12, the construction of a bio-circular accommodation started in Middelburg (Zeeland, the Netherlands).

The aim of this pilot is to demonstrate the possibilities of building with circular and biobased materials in tourist accommodations. The final design consists of a two-storey building with an exhibition space and an apartment.

Would you like to come and take a look? Then come to festival ZLND2050 on Saturday 24 September to view the progress of the construction of this unique accommodation.

Many thanks to

The following parties contributed to the realization of this pilot:

Rothuizen Architecten en Adviseurs B.V

Thys + Gutberlet architectuur

VKP Bouw

Van de Velde installatiegroep

Van Aken schroeffundering

Pictures

Construction started at the location on Kleverkerseweg in Middelburg

Frame 19-9-2022

The most recent pictures of the design:

Graphics of the design
Graphics of the design

The photos below are the first photos of the design, designed by students of the HZ University of Applied Sciences.

First design round
First design round



























Over deze pilot

Thema:Circulair building
R-strategie:Repurpose, Rethink, Reuse
Betrokken partners:HZ University of Applied Sciences

PILOT

Cocreating a demo bioCircular accommodation with stakeholders

In this pilot we demonstrate the viability of circular economy tourist accommodation by co-creating a demo bioCircular accommodation with stakeholders. The focus in this pilot is to look both at techniques using waste material as well as working with parts that could be used in new accommodation or been giving another “afterlife”.

Cocreating a demo bioCircular accommodation with stakeholders



Referenties