FR PLT PR 00016: verschil tussen versies
Geen bewerkingssamenvatting |
Geen bewerkingssamenvatting |
||
Regel 6: | Regel 6: | ||
|Name=Medway | |Name=Medway | ||
|Start date=2016/10/01 | |Start date=2016/10/01 | ||
|End date=2020/ | |End date=2020/07/31 | ||
|Summary=The Medway FRAMES project is focused on increasing environmental resilience to flooding.Nature-based solutions are a new approach in this pilot area, and show promise as they can be applied in the many areas of the catchment where technical or landscape designation restrictions means that there is limited scope for traditional hard engineering approaches. | |Summary=The Medway FRAMES project is focused on increasing environmental resilience to flooding.Nature-based solutions are a new approach in this pilot area, and show promise as they can be applied in the many areas of the catchment where technical or landscape designation restrictions means that there is limited scope for traditional hard engineering approaches. | ||
|Show summary=Nee | |Show summary=Nee |