=== Pilot Integration public transport and target group transport between Middelburg and Vlissingen ===
This pilot is focussed on streamlining the transport by combining the target group transport and public transport. To be specific: in this pilot we organize a bus service between Middelburg and Vlissingen which is demand-base and very flexible.
=== Resources needed ===
{| class="wikitable"
|Investments
|Investments: survey costs € 25.000,-. Human resources (knowledge): Middelburg, Vlissingen. Provincie Zeeland, Connexxion, Taxi de Vlieger, APPM,
|-
|Yearly maintenance
|n.a.
|-
|Pilot costs
|survey costs € 25.000,-.
|-
|Costs permanent solution
|Unknown
|-
|Timeframe: solution acception, how long does this need to be adopted by the initiator?
|Because of COVID this project had been delayed for a long time. The feasibiliity study starts in june 2020 and will end in september 2020. In the period septemebr untill december 2020 we will work at the solution acception
|-
|Which resources are in the pilot and which are not
|Human resources and survey costs
|-
|Ideas about optimilisation for the future
|Unknown
|}
{{Light Context
{{Light Context
|Supercontext=LC_00849
|Supercontext=LC_00849

Versie van 3 mei 2023 12:58

Pilot Integration public transport and target group transport between Middelburg and Vlissingen

This pilot is focussed on streamlining the transport by combining the target group transport and public transport. To be specific: in this pilot we organize a bus service between Middelburg and Vlissingen which is demand-base and very flexible.

Resources needed

Investments Investments: survey costs € 25.000,-. Human resources (knowledge): Middelburg, Vlissingen. Provincie Zeeland, Connexxion, Taxi de Vlieger, APPM,
Yearly maintenance n.a.
Pilot costs survey costs € 25.000,-.
Costs permanent solution Unknown
Timeframe: solution acception, how long does this need to be adopted by the initiator? Because of COVID this project had been delayed for a long time. The feasibiliity study starts in june 2020 and will end in september 2020. In the period septemebr untill december 2020 we will work at the solution acception
Which resources are in the pilot and which are not Human resources and survey costs
Ideas about optimilisation for the future Unknown