Building with a wooden support structure
Hotel Jakarta Amsterdam has a unique 30-meter high wooden main supporting structure. Beams, columns, ceilings and window frames are done in natural wood with FSC or PEFC certification
circulair building
Circular accommodation
This villapark and campsite in Kortgene wants to innovate in its recreation product and has shared this ambition with WTS architects and Impuls Zeeland. On the banks of the Veerse Meer, a location ...
circulair building
Circular and Biobased cycle path
This best practice is about a Cycle path made of bioasphalt and biobased concrete
Circular building that matches the environment
A business plan for the construction of a center building / workshop that fits in the environment, in a circular manner
circulair building
Circular building with blocks
Facadeclick is the unique, circular product of Speed Building System, a Belgian company founded in 2016. It is a fast construction system in which a joint-free, circular façade can be quickly built ...
circulair building
Circular swimmingpool
Camping park Ons Buiten build a circular building for an indoor swimming pool. There was an old-fashioned building that was not sustainable, the new building is flexible, future-proof, built with ...
circulair building
Energy-neutral and circular building
The Veere Beach Exploitation Foundation (SSV) manages, operates and monitors the beaches of the townships Veere and Vlissingen. In 2020 they build a (partly) circular beach post on the beach of ...
Fully demountable pavilion
The entire pavilion of The Green House is demountable. The construction used as many recycled materials as possible, and these will also be reused when the building is removed.
Re-use materials from old buildings
High-quality reuse of materials coming from an old building and a circular energy installation
Sustainable animal shelter
The design incorporates sustainable materials such as untreated wood with an FSC quality mark and grasses such as reed and pressed bamboo
Sustainable sanitary building
To save energy at holiday park RCN de Jagerstee, they have installed a sustainable sanitary building. This to save energy costs and because sustainability is very important to the park. They also ...
Swimming pool heating with biomass system
A swimming pool in Lemmer right next to the IJsselmeer is heated by a biomass installation. The biomass installation heats the indoor air and the swimming pool water.
Circulair building
Circulair building
HZ Kenniscentrum Kusttoerisme
Edisonweg 4
Postbus 364
4380 AJ Vlissingen
kenniscentrumtoerisme@hz.nl
Copyright 2024 HZ Kenniscentrum Kusttoerisme | Disclaimer | Cookieverklaring | Privacyverklaring